The Square


We propose to form a new square that will be the active hub of the scheme. This square is formed from Building 5, the Reception Building and a new building to the east. Our aim is for this space to be a destination for the Greenbank community and attract the public from the cycle path. The square will have pedestrian access from the Corner of Co-operation Road and Turley Road and the cycle path.

As the heart of the scheme, we would locate active B1 and A1/A3 uses around the square such as bar/cafe, cycle shop, chocolate maker.

The Reception Building will have a bar/cafe with flexible community space on the 1st floor similar to the Tobacco Factory and contain such uses as bar, restaurant, art gallery, performance space and community space for workshops, creches etc.

The landscaping to the square would be allow for tables and chairs to be set out and the potential for a weekly market. Due to the level change we have shown steps leading down to the rear of the Reception Building that will form an informal amphitheatre/ performance space. Although primarily urban in nature the square will be greened with planters and trees that form informal play spaces.

Since the previous exhibition the tower has moved from the rear of building 2, reduced in size and relocated to the junction between the cycle path and the square. The “Cycle Dock” is a landmark on the cycle path and signifies the entrance to the Square. At the lower level, the level of the square, it houses a cycle shop (hire, maintenance and storage) and an energy centre with the CHP boiler and recycling facilities. At the upper level, the level of the cycle path, there is a cafe, that is accessed directly from the cycle path with a terrace overlooking the square. The building has 4/5 storeys of residential apartments above the cafe. This is approx the height of building 5 and will form a beacon on the cycle path.

Sketch perspective of the square and cycle dock
Sketch perspectives of the square
Plan of the square with example images